Ausschreibung

UNITED HEAT Wastewater Heat Pump - EPC-Contractor - Detailed Engineering and Construction, Sachsen - Frist 24.08.2026

The project involves detailed engineering and construction of a large‑scale wastewater heat pump and associated infrastructure at the Klärwerk Nord site, linking the district heating networks of Görlitz (Germany) and Zgorzelec (Poland) to create a cross‑border thermal network.

Ausführung

Sachsen

Frist

Datenbank

Zurück zu allen Ausschreibungen

Leistungsbeschreibung

The project involves detailed engineering and construction of a large‑scale wastewater heat pump and associated infrastructure at the Klärwerk Nord site, linking the district heating networks of Görlitz (Germany) and Zgorzelec (Poland) to create a cross‑border thermal network.

Id: 73312840-c30d-4c00-b488-d0bedb436e0e